Phase 2 will be replacing all “manual” read meters to “radio” read meters.

Shown below is a “T” in the Main Line in the area where the infrastructure is old. There were tree roots under this connection that pushed it up and caused the leak. This is part of the infrastructure that will be replaced with the USDA Loan that we have been approved for.

Menu